The Tides Reach development consists of a new build 50-bedroom wing for the new hotel and the refurbishment of the existing structure.

This development formed the hotel’s ground floor restaurant, Upper Deck Bar and Lower Deck Beach Bar, and 10 residential apartments on floors above. It also hosts a luxury new Spa and pool. CAP was responsible for installing Knauf drylining systems with an Airless spray plaster finish.

Client: We Are Ease Ltd
Project Value: £850,000

Talk to us today about your project:Telephone: 01392 464407 • Send us a message

  • Case Studies: Bishops Fox School

    The £7 million Somerset County Council project ensuring that young people in the Taunton area continued to receive high quality education.

    View Case Study
    BISHOPS FOX
    BISHOPS FOX
  • Case Studies: Byrons

    Supply and installation of Knauf metal stud partitions & drylining system with an Airless spray plaster finish.

    View Case Study
    BYRONS
    BYRONS
  • Case Studies: GSA

    This project involved constructing a 312-bedroom student accommodation scheme in central Exeter.

    View Case Study
    GSA
    GSA