Two brand new buildings which consisted of a teaching block including 12 classrooms and 4 IT suites as well as a dedicated theatre and activity studio.

CAP Contributed to the construction of the new teaching block, theatre and studio. CAP was responsible for the Supply and installation of Siniat Metal Stud Partitions, Zentia Suspended Ceilings, Ecophon Acoustic Solutions, & Knauf Airless Spray plaster. The construction of this project occurred during the COVID 19 Pandemic.

Client: BAM Construction
Project value: £300.000

Talk to us today about your project: Telephone: 01392 464407

  • Case Studies: Byrons

    Supply and installation of Knauf metal stud partitions & drylining system with an Airless spray plaster finish.

    View Case Study
    BYRONS
    BYRONS
  • Case Studies: GSA

    This project involved constructing a 312-bedroom student accommodation scheme in central Exeter.

    View Case Study
    GSA
    GSA
  • Case Studies: Tide Reach Hotel

    The waterfront Tides Reach Hotel is a mixed-use facility and incorporates the remodelling of the existing building.

    View Case Study
    TIDES REACH
    TIDES REACH